Emergency Operations are defined as operations or repairs of facilities to prevent imminent harm to the health, safety, or welfare of persons or property.  Contractors are authorized to perform an emergency operation or repair before obtaining a permit.  However, a permit must be applied for no later than noon the next business day OR within 24 hours of beginning work.

If you are unsure if your work qualifies as emergency work, email rightofway@austintexas.gov for help

 

STEP 1

Determine if you need an Excavation (EX) Permit or a Temporary Use of the Right of Way Permit (TURP)

  • Excavation Permit - Emergency work that requires removing or otherwise disturbing soil or pavement in the ROW
  • Temporary Use of Right of Way Permit (TURP) - Emergency work that obstructs the ROW with work-related vehicles, equipment, or material  

STEP 2

Read “How to Apply for Permits on the ABC Website”.  Apply for an EX permit or TURP at AUSTIN BUILD + CONNECT.  Provide the following:

  • Description: Who, What, When, Where, Why, How
    • Example: ABC Gas Services will make an emergency repair on a leaking gas main at 505 Barton Springs Rd on 01/01/01 to prevent imminent damage or injury to a person or the public.  This may require a 5x5 street cut, and 5x5 cut behind the curb. The work may require closing the sidewalk, parking lane and one travel lane on S 1st St. 
  • Write EMERGENCY in the Project or Event Name” field