The Emma S. Barrientos Mexican American Cultural Center (ESB-MACC), located at 600 River Street on Lady Bird Lake, adjacent to the Waller Creek Boathouse and Rainey Street Historical District, is entering Phase 2 of the 2018 Facility Expansion Plan (2018 Plan) approved by City Council. Phase 2 includes expansion and renovation of the facility in addition to site improvements in order to meet the growing needs of the community, supporting programs which foster meaningful understanding and appreciation of Mexican American, Native American, Chicano and other Latinx Cultures.

Aerial view of ESB-MACC taken in March 2020

Background

The ESB-MACC is located on Lady Bird Lake adjacent to the Waller Creek Boathouse and the Rainey Street Historical District. The ESB-MACC is dedicated to the preservation, creation, presentation, and promotion of Mexican American and Latino cultural arts and heritage. The center is a tremendous resource for the community and visitors to learn and participate in classes and programs. The programs and education curriculum include the areas of visual art, theater, dance, literature, music, multimedia, and the culinary arts.

Construction of Phase 1 of the ESB-MACC was completed in 2007 and Phase 1A was completed in 2010 and both were based on the Master Plan developed in 2000 (2000 Plan) by CasaBella Architects. In 2017, CasaBella Architects began working on an update to the 2000 Master Plan which took into consideration evolving community needs and changes in the urban context. This new Facility Expansion Plan (2018 Plan) was adopted by City Council in March 2018.

The current ESB-MACC facility has insufficient space to host the myriad of community activities available or desired. As such, staff & storage areas are inadequate in providing support. Existing public space is in need of interior updates and building expansion to improve functionality to better meet present and future needs. Connectivity to the hike and bike trails, Lady Bird Lake, and pedestrian walkways and surrounding neighborhood are needed to activate the plaza and draw patrons to the facility. This new addition shall pay homage to the late renowned Mexican design architect, Teodoro Gonzalez de Leon. The remodel shall also successfully integrate with the urban context of the newly gentrified area. Lastly, a grand promenade is needed to better define the entrance and to signify this as a premier cultural destination for visitors and citizens alike. To begin, a thorough review of the 2018 ESB-MACC Master Plan is needed to prioritize the scope of work acceptable for phase 2 to best leverage the limited funding.

Project Description

The funds assigned will not be enough to build the entire scope of Phase II as outlined in the 2018 Plan. Step 1 of the project will focus on building programming, identifying aspects of the 2018 Plan to be implement with the 2018 GO Bond funds. The building programming phase should identify priorities from the 2018 Plan to be implemented with current funds. The Project Team will consult with the community to identify the most pressing needs of the community that can be achieved with the building funds.

Phase 2 of the Council approved 2018 Plan underwent significant community engagement and will provide the project parameters. The community engagement process will evolve through the project, moving from consultation to informational only.

Once priorities have been decided, the Project Team will create the initial design for consultation with the community. Phase 2 design and construction is estimated to take place over the next four years with a grand opening in 2024.

Anticipated Timeline

  • November 2020 – Execution of design contract with the Joint Venture Miro Rivera Architects and Tatiana Bilbao (JV MRA|TB) and start of design
  • December 2020 - Execution of Construction Manager at Risk contract with Rogers O’Brien
  • Fall 2022 - Design completed
  • Winter 2022 - Start of Site Construction
  • Spring 2024 - Construction completed
  • Summer 2024 - Grand Opening

Community Engagement

Due to COVID-19 restrictions, community engagement will take place primarily over online and digital platforms until further notice.

Step 1: Building Programming

The first step for this project is to confirm the priorities to as defined from the 2018 Master Plan are still relevant and in the correct order of priority. This list will be incorporated into a project program. This project program will then be presented to the community and stakeholders for their feedback. This Step will begin in December 2020 and conclude at the end of February 2021.

Step 2

The second step will be a community consultation on the design elements, confirmed by budget and the planning process outlined. This step is intended to obtain input on different design elements and be inspired by community members. This step will also confirm the final plan aligns with the goals of the Master Plan

The subsequent community engagement steps will be informational only, illustrating the design and progress as it moves through the design development and construction document phases.

Funding and Resources

Funding for Phase 2 of the 2018 Plan project was obtained through approval of the 2018 General Obligation Bond Election, Proposition B, Libraries, Museums and Cultural Arts Facilities. The 2018 Bond Contract with the Voters (Resolution No. 20180809-061) directed $27 million from Proposition B to the ESB-MACC. The remaining balance dedicated to the ESB-MACC from Proposition Four of the 2006 General Obligation Bond Election and rental proceeds from 64/70 Rainey Street are also contributing to the project.

Contact Information

If you have questions or comments, please contact Christina Bies, Project Coordinator, Parks and Recreation Department, by email or call 512-974-9490.

Facility Expansion Plan 2017-2018

Rendering of future ESB-MACC from 2018 Facility Expansion Plan

The Austin City Council adopted the Emma S. Barrientos Mexican American Cultural Center (ESB-MACC) Master Plan on May 24, 2018. The plan presents design recommendations to better meet the current and future needs of the center. The process sought public input on programming to guide the expansion of the existing facility, new facilities, new shade structures, parking, landscaping and the potential redesign of the plaza. Additional site plan elements include design options for mobility access or circulation, the “Gran Entrada” or entrance to the complex, its relationship to the waterfront at Lady Bird Lake and Waller Creek, and to the neighboring commercial and residential properties.

    Final Draft Facility Expansion Plan (Master Plan)

    Facility Expansion Plan (Master Plan) (PDF, 8 MB)

    • Table of Contents
    • Executive Summary
    • Scope of Work
    • Project Schedule
    • Programming of Spaces
    • Final Renderings
    • Cost Estimates
    • Funding Strategies
    • Civil Engineering
    • Landscape Architecture

    Public Involvement Report, Plan, and Materials (PDF, 21 MB)

    • Public Involvement Report and Plan
    • Public Meeting I Flyers/Handouts
    • Public Meeting I Presentation
    • Public Meeting I Station Comments
    • Public Meeting I Sign in Sheets
    • Phase I Survey
    • Phase I Survey Report
    • Public Meeting II Flyers/Handouts
    • Public Meeting II Presentation
    • Public Meeting II Sign In Sheets
    • Phase II Questionnaire
    • Phase II Questionnaire Report
    • Public Meeting III Flyers/Handouts
    • Public Meeting III Sign in Sheets
    • Public Meeting III Presentation
    • Phase III Questionnaire
    • Phase III Questionnaire Report
    • Social Media Posts Examples
    • News Media Articles
    • E-Blast Examples
    • Photos

    Full High Resolution Facility Expansion Plan Download (PDF, 181 MB)

    Community Engagement

    Phase 1 Public Input

    Public input on the project began in late May of 2017 with the team hosting four small stakeholder group discussions with the MACC Board, former board members, artists, community members and ESB-MACC staff. Three additional sessions were hosted with partners such as the Waller Creek Conservancy and The Trail Foundation. The first of three public open house meetings took place on June 17th and provided participants an overview of the project and an opportunity to discuss programming space needs directly with representatives from the CasaBella design team. This phase encouraged participants to complete a substantive survey made available online and in print. A list of the public meeting materials is available for download here:

    Open House Community Meeting, Saturday, June 17th, 10am-1:00pm

    La Gran Entrada Performance and Gallery La Plaza (El Zocalo) Waterfront Additional Space Circulation View Meeting Presentation View Meeting Handout

    Phase 2 Public Input

    On October 7, 2017, the City hosted a second public open house meeting for the CasaBella design team to present a series of design concepts that responded to the input received from the community.  Four additional focus group sessions were held with performance and visual artists, community arts and cultural groups to gather feedback on how well the proposed design concepts met the objectives and needs for the future. The public feedback received during this meeting helped CasaBella prioritize elements of the design and prepare a final recommendation to be presented during the third and final public open house. A list of the public meeting materials is available for download here:

    Open House Community Meeting #2, Saturday, October 7th, 10am-12pm

    View Meeting Presentation View Meeting Handout Questionnaire

    Phase 3 Public Input

    On January 20, 2018, the third and final public meeting was hosted by the City to present a final draft of the proposed Master Plan. The purpose of the meeting was to document public input on how well the plan accomplishes the needs for each of the Center’s key programming space elements. Feedback received during this phase will be considered for a final design presentation being prepared for City Council, Boards and Commissions in early 2018. A list of the public meeting materials is available for download here:

    Open House Community Meeting #3, Saturday, January 20th, 10am - 12pm

    View Meeting Presentation View Meeting Handout Questionnaire

    Board, Commission and Council presentation schedule

    Board, Commission and Council presentation

    Additional Links for 2018 Plan