Rainey Street Permit Updates – 07/22/24
Rainey Street Permit Updates – 07/22/24
Below, you will find the active and pending right of way permits for the area around Rainey Street as of July 22, 2024. You can note the permit number, contractor, location, permit open and close date, as well as a description of the work being done.
Contact Information for the permit holders and/or project contractors can be found by clicking on the permit number and accessing the hyperlink connecting to the Austin Build + Connect portal.
Permit Dates reflect the date range when work is allowed under the permit. Work can begin at any time within the permit window.
Work schedules and scope are subject to change and unforeseen delays due to weather, utility issues, etc. Unpermitted work in the right of way may also be present.
Please contact ROW Project Coordinator, Evelyn Powers at rightofway@austintexas.gov or call the ROW office at 512-974-7828 if you have any further questions.
Active right of way permits as of July 22, 2024
Cummings Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
GFT/BComm |
700 block Cummings St |
04/18/24 |
08/19/24 |
Vault install |
Alley closure |
Davis Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
|
|
|
|
|
|
|
Rainey Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
Flintco |
90-97 Rainey St |
4/4/22 |
10/22/24 |
Long term closure for duration of project |
Sidewalk / parking on north side of Davis St, Rainey St metered parking & sidewalk (west curb) just north of Davis St intersection |
|
JE Dunn |
80 Rainey St |
1/10/23 |
12/30/24 |
Long term sidewalk and bike lane closure for duration of 48 story tower project |
Rainey St sidewalk (West side) and parking closed on both sides to maintain 2 way traffic |
|
Austin Underground |
60-80 Rainey St |
4/24/23 |
7/31/24 |
Wastewater service, manhole installs |
Alley between Service Rd and Rainey |
|
Austin Underground |
61 Rainey St |
02/09/24 |
7/31/24 |
Water service install |
Behind existing sidewalk closure on Rainey St (South end, East curb) |
|
Sungrow |
60-89 Blk Rainey St |
02/13/24 |
08/11/24 |
Installing new sidewalk |
Behind existing closure on Rainey St |
|
Ironwood/Trine |
91 Rainey St |
6/28/23 |
09/01/24 |
Repair to building at southwest corner. |
None – Pedestrian covered walkway |
|
Austin Underground |
60-89 Rainey St |
07/08/24 |
08/07/24 |
Installing light pole & electrical conduit |
Behind existing closure on Rainey St |
|
Mastec |
90-99 Block Rainey St |
07/17/24 |
08/20/24 |
Installing street light duct bank |
Behind existing closure on Rainey St |
Driskill Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
Red River Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
DPR Construction |
98 Red River St - |
5/28/22 |
11/12/24 |
Long term travel lane and sidewalk closure for duration of project |
Travel lane and sidewalk closure (south curb on Cesar Chavez, and West curb on Red River. East curb sidewalk on Red River closed to maintain 2-way vehicle traffic |
|
Vertex |
100 block Red River St |
04/03/24 |
08/31/24 |
Gasket and window seal repairs on Fairmont Austin using scaffolding. |
Pedestrian covered walkway |
|
Vesta |
98 Red River St |
06/14/24 |
12/11/24 |
Install sidewalk, curb & gutter |
Behind existing closure on Red River St |
|
Vesta |
98 Red River St |
06/14/24 |
12/11/24 |
Install 4 driveway approaches |
Behind existing closure on Red River St |
River Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
DPR Construction |
700 River St (North side of the street) |
7/6/2022 |
08/30/24 |
Long term traffic control setup for 43 story residential project |
Parking lane and sidewalk closure on North curb of River St between Rainey St & East Ave |
|
SLC Services |
700 River St |
10/24/23 |
12/1/24 |
Installing sidewalk, curb and gutter |
Behind the 700 River St closure (mentioned above) |
|
Austin Underground |
700 block River St |
02/29/24 |
7/31/24 |
Storm drain manhole install |
Full closure of River St just east of the traffic circle |
|
Austin Underground |
700 block River St Alley |
07/22/23 |
08/18/24 |
Installing storm drain manhole and wastewater services |
Alley between Rainey St and service road |
|
Austin Underground |
700 block River St |
07/08/24 |
08/07/24 |
Installing electrical duct bank |
Behind existing long term closure |
East Ave
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
Sungrow/SLC |
60-70 East Ave |
02/13/24 |
08/11/24 |
Installing new driveway and curb/gutter |
Behind existing long-term closure |
|
SMD/Color-Aid |
East Ave |
2/13/24 |
8/11/24 |
Excavation for signpost foundations |
Behind existing long term closure |
|
24-081611 EX |
SBO/API |
East Ave |
7/3/24 |
9/30/24 |
Installing sidewalk on West curb |
Sidewalk closure – west curb |
Austin Underground |
East Ave |
7/15/24 |
8/15/24 |
Installing light pole & electrical conduit |
Behind existing long-term closure |
Pending Rainey Street right of way permits as of July 22, 2024
(Pending = new permits under review or potential extensions of existing permits.)
Rainey Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
Restek |
51 Rainey St |
|
|
Working on balconies overhead |
None – pedestrian walkway |
|
24-075695 EX |
ATT |
89 Rainey St alley |
|
|
placing 30 ft conduit in the alley |
Alley closure |
Davis Street
Permit #
|
Contractor
|
Location
|
Permit Open Date |
Permit Close Date |
Description |
Closure |
Mastec |
610 Davis St |
|
|
Installing street lights |
|
|
Lehne Construction |
610 Davis St |
|
|
Installing new alley paving, curb/gutter, and paver subslab |
Behind existing long term closure Alley between Red River & Rainey St |
Driskill Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
TGS |
700 Block Driskill St |
|
|
Replacing gas main |
Sidewalk closure |
Red River Street
Permit #
|
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
ATT |
84-94 Red River St |
|
|
Temp access to manhole to pull conduit |
|
River Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
Bierce Street
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
AE/Mastec/ Primoris |
80 Block Bierce St |
|
|
Removing cables via manhole in middle of the street |
|
East Ave
Permit # |
Contractor |
Location |
Permit Open Date |
Permit Close Date |
Description |
Closure |
24-078926 EX |
AE/FRI |
East Ave |
|
|
Installing electrical duct bank along East Ave |
|
Additional information on private development with ROW work in the area can be found in the Development Tracker and Property Profile tools, linked below.