Waller Creek Flood Management and Water Quality Improvements StudyCIP 485-617-5011SummaryThis study developed a flood management plan for the lower Waller Creek watershed (W. 15th to Town Lake). Also, a water quality master plan for the entire Waller Creek watershed was prepared. Architectural review of the proposed improvements will be performed to ensure compatibility.An 18 foot diameter tunnel from 15th Street to Town Lake, under Trinity Street, is being proposed. The tunnel will divert flood flows from Waller Creek and will provide limited water quality improvements. The proposed project will include pumping of water from the tunnel to Waller Creek at 15th Street to increase base flow. The estimated project cost is $16,800,000. The project's benefit/cost ratio under current conditions is 0.50. StatusThe final report has been submitted. The project will be listed as an unfunded potential C.I.P. project. Employees of the Drainage Utility Department are inquiring with the U.S. Corps of Engineers on their interest in funding the project. (COE funding is unlikely, given the low benefit/cost ratio of the project.)DescriptionThe details developed by the study will include the costs and economic benefits of the flood management and water quality plan. Evaluation of the plan will indicate the required funding for a future bond election or appropriation.Basic DataRevised March 11, 1996 Back to the March 1996 Contents To Downtown Map |
|
|
|
![]() |
Austin City Connection - The Official Web site of the City of Austin |
| Contact Us: Send Email or 512-974-6415. | |
| Legal Notices | Privacy Statement | |
| © 1995 City of Austin, Texas. All Rights Reserved. | |
| P.O. Box 1088, Austin, TX 78767 (512) 974-2000 | |